ONE WAY TO BOULDER CITY

This 10 week project from Las Vegas, to Boulder City lays 7,000 feet of 10 inch .375 wall steel pipe in the ground through some areas of solid rock. This one way gas line required controlled pressure in phases as this installation took place. Beside the solid rock, our 9 man crew had the task of laying pipe under a rail road crossing. Great job.